{"id":16416,"date":"2019-01-09T14:10:18","date_gmt":"2019-01-09T14:10:18","guid":{"rendered":"https:\/\/www.hawkins.biz\/?post_type=case_study&#038;p=16416"},"modified":"2025-09-16T17:03:25","modified_gmt":"2025-09-16T16:03:25","slug":"investigations-into-ground-related-failures-part-2-design-stage-issues","status":"publish","type":"case_study","link":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/","title":{"rendered":"Investigations into Ground Related Failures Part 2 &#8211; Design Stage Issues"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"16416\" class=\"elementor elementor-16416\" data-elementor-post-type=\"case_study\">\n\t\t\t\t\t\t<section class=\"has_eae_slider elementor-section elementor-top-section elementor-element elementor-element-4b1656d8 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-eae-slider=\"90542\" data-id=\"4b1656d8\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"has_eae_slider elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4de24e5\" data-eae-slider=\"64200\" data-id=\"4de24e5\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-ddeedb7 elementor-widget elementor-widget-text-editor\" data-id=\"ddeedb7\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Geotechnical engineering is a sub-branch of civil engineering, focusing on the engineering behaviour of rocks and soils, often in relation to soil-structure interaction. Geotechnical engineers design and construct earthworks, foundations, slopes, retaining walls and other underground structures. The soil-structure interaction aspect requires detailed knowledge and experience of soil and rock mechanics along with engineering geology and structural engineering.\u00a0<\/p><p>Civil engineering and building failures are often caused by geotechnical issues and these can be grouped by errors \/ omissions at the different stages of the project: ground investigation, design, and construction, often with a combination of interacting issues. In the first of a series of articles on ground related failures, issues with\u00a0ground investigation\u00a0and the false economy of skipping this step were discussed. In this article the discussion continues with a closer look at failures mainly caused by poor design.\u00a0<\/p><h4><span style=\"color: #0a527a;\">The Design Stage of a Construction Project<\/span><\/h4><p>Once the ground investigation (GI) and testing has been carried out and the results issued in a Factual Report, usually written by the GI contractor, the data require careful analysis and consideration by an experienced geotechnical engineer, who will write an Interpretative Geotechnical Report.<\/p><p>The Interpretative Geotechnical Report is often not carried out to save money, but is extremely important since it is the link between the GI and the design. It is imperative that conservative soil parameters are chosen as the basis of the design and this is not straightforward when test results can be widely scattered. The \u2018moderately conservative\u2019 approach should be taken rather than using the average or the \u2018worst case\u2019 design parameters.<\/p><p>Designing structures in or on the ground requires detailed knowledge of not only the soil in the undisturbed state, but also the effect of the construction itself on the soil parameters. Installation of piles is a good example, where bored piles disturb and so weaken the soil much more than driven piles or even continuous flight auger (CFA) piles.<\/p><p>The worst case loading situations should also be adopted, which means for retaining walls, for example, that accidental high ground water should be assumed (e.g. from a burst water main) and that excavation in front of the wall may take place in the future (e.g. to replace services).<\/p><h4><span style=\"color: #0a527a;\">Case Study: Sheet Pile Retaining Wall<\/span><\/h4><p>This case involved the failure of a temporary sheet pile retaining wall installed at the boundary of a new homes&#8217; building site to allow the installation of a permanent reinforced concrete (RC) retaining wall.<\/p><p>Immediately behind the sheet pile on the retained side was a series of brick boundary walls and an existing Victorian brick house. The sheet pile retaining wall failed by forward rotation during the excavation for the permanent wall, allowing the ground behind to move forward, causing the failure of the brick walls and half of the house, which later required full demolition (see Figure 1).<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3ad87a9 elementor-widget elementor-widget-image\" data-id=\"3ad87a9\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"531\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-Related-Failures-Part-2-001-1024x680.jpg\" class=\"attachment-large size-large wp-image-15926\" alt=\"Figure 1: The sheet pile wall in the foreground with the damaged house behind.\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-Related-Failures-Part-2-001-1024x680.jpg 1024w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-Related-Failures-Part-2-001-300x199.jpg 300w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-Related-Failures-Part-2-001-768x510.jpg 768w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-Related-Failures-Part-2-001-1536x1020.jpg 1536w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-Related-Failures-Part-2-001-2048x1360.jpg 2048w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-Related-Failures-Part-2-001-scaled.jpg 1920w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Figure 1: The sheet pile wall in the foreground with the damaged house behind.<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b9c976e elementor-widget elementor-widget-text-editor\" data-id=\"b9c976e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>As part of my investigation into the cause of the failure, I designed, contracted and supervised a site investigation (SI) to understand the soil parameters at the site, including carrying out standard penetration tests (SPT), cone penetration tests (CPT) and window sampling, and then carried out a review of the original design.<\/p><p>It was clear that the original design significantly underestimated the ground water level and the depth of the excavation in front of the wall, as well as the surcharge load from the house on the retained side. In addition, the design overestimated the strength of the soil using an \u2018average\u2019 design line rather than a \u2018moderately conservative\u2019 approach and did not specify what strength the backfill material was to be (the sheet-piles were installed in a slip-trench, which was then backfilled).<\/p><p>Further, the design only used the stronger short-term undrained soil parameters, rather than the weaker long-term drained soil parameters. It is reasonable to use short term parameters for temporary works design, but only if the structure has a short lifespan and if drained conditions are not likely to be encountered during this timescale.<\/p><p>I then carried out a back-analysis of the wall, including modelling the construction sequence (see Figures 2a to 2c), using the specialist geotechnical software FREW (Flexible REtaining Wall analysis) by OASYS. My back-analysis, using more reasonable, moderately conservative parameters, showed that the deflections in the undrained state were three times that expected in the original design and once the parameters were switched to drained, full failure occurred as took place in reality.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a57a4f5 elementor-widget elementor-widget-image\" data-id=\"a57a4f5\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"550\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-002.png\" class=\"attachment-large size-large wp-image-15927\" alt=\"Figure 2a: Construction stages 1 and 2, used for the FREW back-analysis\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-002.png 819w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-002-300x206.png 300w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-002-768x528.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Figure 2a: Construction stages 1 and 2, used for the FREW back-analysis<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1116bc4 elementor-widget elementor-widget-image\" data-id=\"1116bc4\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"546\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-003.png\" class=\"attachment-large size-large wp-image-15928\" alt=\"Figure 2b: Construction stages 3 and 4, used for the FREW back-analysis\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-003.png 822w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-003-300x205.png 300w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-003-768x524.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Figure 2b: Construction stages 3 and 4, used for the FREW back-analysis<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4e598fa elementor-widget elementor-widget-image\" data-id=\"4e598fa\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"547\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-004.png\" class=\"attachment-large size-large wp-image-15929\" alt=\"Figure 2c: Construction stages 5 and 6, used for the FREW back-analysis\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-004.png 820w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-004-300x205.png 300w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/Ground-related-failures-part-2-004-768x525.png 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Figure 2c: Construction stages 5 and 6, used for the FREW back-analysis<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9e15b0d elementor-widget elementor-widget-text-editor\" data-id=\"9e15b0d\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>In this example poor design led to the failure of the sheet pile and consequential damage to the adjacent property.<\/p><h5>Read part III here: <a href=\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-3-construction-stage-issues\/\">Construction Stage Ground Failures: Case Study\u00a0<\/a><\/h5>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-71e09a6 elementor-widget elementor-widget-text-editor\" data-id=\"71e09a6\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4><span style=\"color: #0a527a;\">About The Author<\/span><\/h4><p><a href=\"https:\/\/www.hawkins.biz\/experts\/andrew-reeves\/\" target=\"_blank\" rel=\"noopener\" data-concrete5-link-type=\"image\">Andrew Reeves<\/a>\u00a0is a Chartered Civil Engineer with a background in the design and construction of large-scale geotechnical solutions in UK, Germany and Hong Kong, including deep basements, large diameter bored pile foundations, retaining walls and tunnels.<\/p><p>More recently Andrew has carried out structural design in timber, masonry, steel and reinforced concrete as well as fire risk assessments for domestic and small-scale buildings in the UK.<\/p><p>Since joining Hawkins in October 2013, Andrew has investigated many building-related failures including the collapse of structures, flooding of buildings and land, failure of basement waterproofing, failure of retaining walls and serviceability issues caused by subsidence.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Civil engineering and building failures are often caused by geotechnical issues and these can be grouped by the different stages of the project: ground investigation, design, and construction, often with a combination of interacting issues. <\/p>\n","protected":false},"featured_media":15925,"parent":0,"template":"","experties":[62],"class_list":["post-16416","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","experties-built-environment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Design Stage Ground Failures: Forensic Review | Hawkins<\/title>\n<meta name=\"description\" content=\"Hawkins examines ground failures due to design flaws, highlighting the need for accurate geotechnical modeling and site-specific data.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design Stage Ground Failures: Forensic Review | Hawkins\" \/>\n<meta property=\"og:description\" content=\"Hawkins examines ground failures due to design flaws, highlighting the need for accurate geotechnical modeling and site-specific data.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/\" \/>\n<meta property=\"og:site_name\" content=\"Hawkins Forensic Investigation\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-16T16:03:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"830\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/\",\"url\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/\",\"name\":\"Design Stage Ground Failures: Forensic Review | Hawkins\",\"isPartOf\":{\"@id\":\"https:\/\/www.hawkins.biz\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg\",\"datePublished\":\"2019-01-09T14:10:18+00:00\",\"dateModified\":\"2025-09-16T16:03:25+00:00\",\"description\":\"Hawkins examines ground failures due to design flaws, highlighting the need for accurate geotechnical modeling and site-specific data.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#primaryimage\",\"url\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg\",\"contentUrl\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg\",\"width\":830,\"height\":630,\"caption\":\"A collapsed wall that has taken the wall down of the neighbouring property\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.hawkins.biz\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\/\/www.hawkins.biz\/case_study\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Investigations into Ground Related Failures Part 2 &#8211; Design Stage Issues\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.hawkins.biz\/#website\",\"url\":\"https:\/\/www.hawkins.biz\/\",\"name\":\"Hawkins Forensic Investigation\",\"description\":\"Specialising in Forensic Investigation\",\"publisher\":{\"@id\":\"https:\/\/www.hawkins.biz\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.hawkins.biz\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.hawkins.biz\/#organization\",\"name\":\"Hawkins and Associates\",\"url\":\"https:\/\/www.hawkins.biz\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg\",\"contentUrl\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg\",\"width\":164,\"height\":61,\"caption\":\"Hawkins and Associates\"},\"image\":{\"@id\":\"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/hawkins-and-associates-limited\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Design Stage Ground Failures: Forensic Review | Hawkins","description":"Hawkins examines ground failures due to design flaws, highlighting the need for accurate geotechnical modeling and site-specific data.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/","og_locale":"en_GB","og_type":"article","og_title":"Design Stage Ground Failures: Forensic Review | Hawkins","og_description":"Hawkins examines ground failures due to design flaws, highlighting the need for accurate geotechnical modeling and site-specific data.","og_url":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/","og_site_name":"Hawkins Forensic Investigation","article_modified_time":"2025-09-16T16:03:25+00:00","og_image":[{"width":830,"height":630,"url":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/","url":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/","name":"Design Stage Ground Failures: Forensic Review | Hawkins","isPartOf":{"@id":"https:\/\/www.hawkins.biz\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#primaryimage"},"image":{"@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg","datePublished":"2019-01-09T14:10:18+00:00","dateModified":"2025-09-16T16:03:25+00:00","description":"Hawkins examines ground failures due to design flaws, highlighting the need for accurate geotechnical modeling and site-specific data.","breadcrumb":{"@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#primaryimage","url":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg","contentUrl":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2019\/01\/MAIN-IMAGE-Ground-Related-Failures-Part-2_830x630.jpg","width":830,"height":630,"caption":"A collapsed wall that has taken the wall down of the neighbouring property"},{"@type":"BreadcrumbList","@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-ground-related-failures-part-2-design-stage-issues\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.hawkins.biz\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.hawkins.biz\/case_study\/"},{"@type":"ListItem","position":3,"name":"Investigations into Ground Related Failures Part 2 &#8211; Design Stage Issues"}]},{"@type":"WebSite","@id":"https:\/\/www.hawkins.biz\/#website","url":"https:\/\/www.hawkins.biz\/","name":"Hawkins Forensic Investigation","description":"Specialising in Forensic Investigation","publisher":{"@id":"https:\/\/www.hawkins.biz\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.hawkins.biz\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.hawkins.biz\/#organization","name":"Hawkins and Associates","url":"https:\/\/www.hawkins.biz\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/","url":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg","contentUrl":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg","width":164,"height":61,"caption":"Hawkins and Associates"},"image":{"@id":"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/hawkins-and-associates-limited\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study\/16416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/types\/case_study"}],"version-history":[{"count":18,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study\/16416\/revisions"}],"predecessor-version":[{"id":41595,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study\/16416\/revisions\/41595"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/media\/15925"}],"wp:attachment":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/media?parent=16416"}],"wp:term":[{"taxonomy":"experties","embeddable":true,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/experties?post=16416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}