{"id":17220,"date":"2022-01-31T17:11:58","date_gmt":"2022-01-31T17:11:58","guid":{"rendered":"https:\/\/www.hawkins.biz\/?post_type=case_study&#038;p=17220"},"modified":"2025-09-04T16:47:15","modified_gmt":"2025-09-04T15:47:15","slug":"investigations-into-steel-structure-failures-part-ii-case-studies","status":"publish","type":"case_study","link":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/","title":{"rendered":"Investigations Into Steel Structure Failures Part II: Case Studies"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"17220\" class=\"elementor elementor-17220\" data-elementor-post-type=\"case_study\">\n\t\t\t\t\t\t<section class=\"has_eae_slider elementor-section elementor-top-section elementor-element elementor-element-4c413c3 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-eae-slider=\"67470\" data-id=\"4c413c3\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"has_eae_slider elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-8797e4b\" data-eae-slider=\"66071\" data-id=\"8797e4b\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-57a6b17 elementor-widget elementor-widget-text-editor\" data-id=\"57a6b17\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Hawkins has investigated many cases involving failures of steel structures. Our knowledgeable and experienced team of forensic investigators can establish the cause of a failure by either a detailed desktop study or site investigation, in addition to reviewing the relevant documentation and carrying out numerical back-analysis.\u00a0<a href=\"https:\/\/www.hawkins.biz\/insight\/investigations-into-steel-structure-failures-part-i-failure-mechanisms\/\" target=\"_blank\" rel=\"noopener\">Click here to read part one of this article if you would like more background information<\/a>.<\/p><p>The Hawkins Built Environment team has found that although failures can be caused by either errors in the design, or errors at the construction and execution stage, most failures are often caused by a combination of both.<\/p><h4><span style=\"color: #0a527a;\">CASE STUDY 1: COLLAPSE OF A STEEL PORTAL FRAME<\/span><\/h4><p>Following a storm that affected most parts of the UK, Hawkins was instructed to investigate the cause of the partial collapse of a steel portal framed structure that was under construction.<\/p><p><i>Photo above: Partially collapsed portal frame, which used to be part of a factory building<\/i><\/p><p>The portal frame comprised steel columns and pitched rafters, connected by moment-resisting welded connections.\u00a0 Hawkins carried out both a detailed inspection of the structure, and a review of the design of the structure, and found that the design was adequate.\u00a0 We then carried out a thorough review of the original construction sequence proposal and the sequence of actual construction, to establish whether there were any deviations from the intended sequencing of the works.<\/p><p>Witness accounts, site records, and the site investigation indicated that permanent cross bracings had not been fully installed before the construction of adjacent bays.\u00a0 Hawkins carried out calculations and analysis to assess the load carrying capacity of the structure without the full bracings.\u00a0 The results showed that the portal frame, as constructed, was weak and would fail in the event of high wind loading.\u00a0 In this case, the contractor also failed to use temporary bracings, which should have been provided in order for the structure to withstand wind gusts, as well as to stabilise the structure until permanent bracings were installed.\u00a0 Further investigation revealed that there was no qualified site engineer on site performing a supervisory role for the contractor.<\/p><p>This case highlights the importance of proper site supervision and risk assessment during the construction of steel structures.\u00a0 If proper site supervision and risk assessment had been carried out, it is likely the sequencing of the works would have been revised and temporary bracing would have been provided.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-87ddc34 elementor-widget elementor-widget-text-editor\" data-id=\"87ddc34\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4><span style=\"color: #0a527a;\">CASE STUDY 2: FAILURE OF A ROOF CANOPY<\/span><\/h4><p>A large warehouse roof canopy failed after a period of heavy rain.\u00a0 Hawkins was instructed to establish the cause of the collapse, and in particular whether the failure was caused by defects in either design, construction, or a combination of the two.<\/p><p>Our investigator attended the site within 24 hours of the incident.\u00a0 The single-pitched roof canopy consists of rows of trusses made of thin, galvanised cold-rolled steel sections.\u00a0 The\u00a0roof had deflected so much that it landed on a heavy goods vehicle.\u00a0 Our investigation revealed that the design of the canopy had numerous deficiencies, with the most significant ones being the insufficient capacity of the diagonal truss members, as well as insufficient slope of the roof.\u00a0 Our failure back-analysis showed that the diagonal members were inadequate given the intensity of the rain, causing the truss to sag overall.\u00a0 Because the roof pitch was too flat, a slight sag of the truss would have allowed water to accumulate on the roof, thus increasing the load.\u00a0 The increased load led to further deflection of the truss, eventually causing the failure.<\/p><p>Following on from our involvement, the client asked that we review the design of their assets worldwide.\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fd80cb7 elementor-widget elementor-widget-image\" data-id=\"fd80cb7\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"454\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Roof-Canopy.jpg\" class=\"attachment-large size-large wp-image-17224\" alt=\"A roof collapsing and landing on the lorry below\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Roof-Canopy.jpg 928w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Roof-Canopy-300x170.jpg 300w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Roof-Canopy-768x436.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Deflected roof canopy truss landed on the vehicle below<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a1fe9db elementor-widget elementor-widget-text-editor\" data-id=\"a1fe9db\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4><span style=\"color: #0a527a;\">CASE STUDY 3: BUILDING COLLAPSE<\/span><\/h4><p>Hawkins was instructed to investigate the cause of a sudden collapse of an office building that was under construction. The building consisted of a four-storey steel frame structure. When Hawkins visited the scene, most of the remaining steel frame had already been brought down by the demolition contractor, and the main steel truss was half buried in the debris.<\/p><p>Hawkins examined all the joints of the truss at the Health &amp; Safety Laboratory where the main truss had been transported to and temporarily stored. At one joint, the end of the diagonal member had been welded to the flange of a haunch. The fracture surfaces of the haunch joint indicated the mode of failure was purely ductile rupture caused by tensile overload.<\/p><p data-redactor-inserted-image=\"true\"><i><\/i>Hawkins carried out an investigation using Finite Element Analysis (FEA) software to determine the likely tensile capacity of the haunch joint. The results showed that the web of the haunch was grossly under-designed and that its tensile capacity was much less than the forces it would be required to carry. Our investigation revealed that the collapse of the building was caused by the poorly designed haunch joint that was incapable of carrying the forces applied to it by the diagonal truss member.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-51c98ae elementor-widget elementor-widget-image\" data-id=\"51c98ae\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"531\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/collapsed-office-building.jpg\" class=\"attachment-large size-large wp-image-17225\" alt=\"Remains of the collapsed office building\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/collapsed-office-building.jpg 880w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/collapsed-office-building-300x199.jpg 300w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/collapsed-office-building-768x510.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Remains of the collapsed office building<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-abcea5a elementor-widget elementor-widget-image\" data-id=\"abcea5a\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"532\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Steel-Structure-Failures-Part-1.jpg\" class=\"attachment-large size-large wp-image-17226\" alt=\"Failure at the haunch joint\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Steel-Structure-Failures-Part-1.jpg 880w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Steel-Structure-Failures-Part-1-300x199.jpg 300w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/Steel-Structure-Failures-Part-1-768x511.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Failure at the haunch joint<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f39dd79 elementor-widget elementor-widget-text-editor\" data-id=\"f39dd79\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4><span style=\"color: #0a527a;\">CASE STUDY 4: POST-FIRE INSPECTION OF STEEL STRUCTURES<\/span><\/h4><p>A fire broke out in a manufacturing plant that damaged five conveyors. Hawkins was instructed to carry out a post-fire structural assessment of the steel roof beams that had been located above the fire. We attended the site immediately, because a fast response was required to allow the repair and replacement of the conveyors to progress.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-70238a2 elementor-widget elementor-widget-image\" data-id=\"70238a2\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t<figure class=\"wp-caption\">\n\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"725\" height=\"481\" src=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/stripped-paint.jpg\" class=\"attachment-large size-large wp-image-17227\" alt=\"Stripped paint and flash rusting on the conveyor due to fire\" srcset=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/stripped-paint.jpg 725w, https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/01\/stripped-paint-300x199.jpg 300w\" sizes=\"(max-width: 725px) 100vw, 725px\" \/>\t\t\t\t\t\t\t\t\t\t\t<figcaption class=\"widget-image-caption wp-caption-text\">Stripped paint and flash rusting on the conveyor due to fire<\/figcaption>\n\t\t\t\t\t\t\t\t\t\t<\/figure>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f3db081 elementor-widget elementor-widget-text-editor\" data-id=\"f3db081\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Our investigator carried out a visual inspection of the scene from a mobile elevated work platform. The visual appearance of the roof steelworks did not indicate any visible distortion or deformation. No obvious change in colour and no obvious soot deposits were observed on the roof truss. To verify the post-fire yield strength, we carried out calibrated hardness tests at various locations, such as on the roof beams and around the joints. The test results indicated that the post-fire yield strength of the steel elements was still satisfactory. We found that there was no evidence to suggest that the structural roof steelwork had been adversely affected by the fire. Hawkins provided recommendations to clean the conveyors including rust removal and re-painting of steel elements. Hawkins\u2019 fast response enabled the client to get the unit back into operation as quickly as possible and gave them the confidence to continue using the plant.<\/p><h4><span style=\"color: #0a527a;\">CONCLUSION<\/span><\/h4><p>Failures of steel structures are often caused by errors in both the design and the installation. Hawkins\u2019 Built Environment team has investigated many failures of steel structures. Often these investigations are multi\u2011disciplinary, involving engineers specialising in geotechnical and material science. Our team of experienced forensic investigators provide quick response to failures to assist with stabilisation of the debris and preservation of important evidence. We offer comprehensive failure investigation including root cause determination, assessment of the extent of the damage, and development of rectification proposals. We adopt state\u2011of\u2011the\u2011art technology such as laser scanning and aerial photography to reconstruct the failure scene to facilitate investigation and communication with our clients.<\/p><p>While the probability of structural failure is low, the consequences can be severe. We provide risk management services by carrying out reviews of installation methods and designs to prevent collapses occurring in the first place.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-018a784 elementor-widget elementor-widget-text-editor\" data-id=\"018a784\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h4><span style=\"color: #0a527a;\">ABOUT THE AUTHOR<\/span><\/h4><p><a href=\"https:\/\/www.hawkins.biz\/experts\/yang-dang\/\" target=\"_blank\" rel=\"noopener\">Yang Dang<\/a>\u00a0is a registered Professional Engineer in Singapore with a background in structural design. Before joining Hawkins, Yang has over 10 years\u2019 experience in the structural design of steel, reinforced concrete, precast concrete building in Singapore, Malaysia, and UAE. Yang specialises in investigating building defects and collapse, fa\u00e7ade and cladding failures, and review of structural design.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Hawkins has investigated many cases involving failures of steel structures. Our knowledgeable and experienced team of forensic investigators can establish the cause of a failure by either a detailed desktop study or site investigation, in addition to reviewing the relevant documentation and carrying out numerical back-analysis.<\/p>\n","protected":false},"featured_media":17221,"parent":0,"template":"","experties":[62],"class_list":["post-17220","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","experties-built-environment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Steel Structure Failures: Forensic Case Studies | Hawkins<\/title>\n<meta name=\"description\" content=\"Hawkins investigates steel structure failures using forensic engineering to determine root causes and improve future designs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Steel Structure Failures: Forensic Case Studies | Hawkins\" \/>\n<meta property=\"og:description\" content=\"Hawkins investigates steel structure failures using forensic engineering to determine root causes and improve future designs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/\" \/>\n<meta property=\"og:site_name\" content=\"Hawkins Forensic Investigation\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-04T15:47:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"829\" \/>\n\t<meta property=\"og:image:height\" content=\"629\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/\",\"url\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/\",\"name\":\"Steel Structure Failures: Forensic Case Studies | Hawkins\",\"isPartOf\":{\"@id\":\"https:\/\/www.hawkins.biz\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg\",\"datePublished\":\"2022-01-31T17:11:58+00:00\",\"dateModified\":\"2025-09-04T15:47:15+00:00\",\"description\":\"Hawkins investigates steel structure failures using forensic engineering to determine root causes and improve future designs.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#primaryimage\",\"url\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg\",\"contentUrl\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg\",\"width\":829,\"height\":629,\"caption\":\"Partial collapse of a steel portal framed\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.hawkins.biz\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\/\/www.hawkins.biz\/case_study\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Investigations Into Steel Structure Failures Part II: Case Studies\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.hawkins.biz\/#website\",\"url\":\"https:\/\/www.hawkins.biz\/\",\"name\":\"Hawkins Forensic Investigation\",\"description\":\"Specialising in Forensic Investigation\",\"publisher\":{\"@id\":\"https:\/\/www.hawkins.biz\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.hawkins.biz\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.hawkins.biz\/#organization\",\"name\":\"Hawkins and Associates\",\"url\":\"https:\/\/www.hawkins.biz\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg\",\"contentUrl\":\"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg\",\"width\":164,\"height\":61,\"caption\":\"Hawkins and Associates\"},\"image\":{\"@id\":\"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/hawkins-and-associates-limited\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Steel Structure Failures: Forensic Case Studies | Hawkins","description":"Hawkins investigates steel structure failures using forensic engineering to determine root causes and improve future designs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/","og_locale":"en_GB","og_type":"article","og_title":"Steel Structure Failures: Forensic Case Studies | Hawkins","og_description":"Hawkins investigates steel structure failures using forensic engineering to determine root causes and improve future designs.","og_url":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/","og_site_name":"Hawkins Forensic Investigation","article_modified_time":"2025-09-04T15:47:15+00:00","og_image":[{"width":829,"height":629,"url":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/","url":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/","name":"Steel Structure Failures: Forensic Case Studies | Hawkins","isPartOf":{"@id":"https:\/\/www.hawkins.biz\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#primaryimage"},"image":{"@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg","datePublished":"2022-01-31T17:11:58+00:00","dateModified":"2025-09-04T15:47:15+00:00","description":"Hawkins investigates steel structure failures using forensic engineering to determine root causes and improve future designs.","breadcrumb":{"@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#primaryimage","url":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg","contentUrl":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/12\/MAIN-IMAGE-527921_830x630.jpg","width":829,"height":629,"caption":"Partial collapse of a steel portal framed"},{"@type":"BreadcrumbList","@id":"https:\/\/www.hawkins.biz\/case_study\/investigations-into-steel-structure-failures-part-ii-case-studies\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.hawkins.biz\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.hawkins.biz\/case_study\/"},{"@type":"ListItem","position":3,"name":"Investigations Into Steel Structure Failures Part II: Case Studies"}]},{"@type":"WebSite","@id":"https:\/\/www.hawkins.biz\/#website","url":"https:\/\/www.hawkins.biz\/","name":"Hawkins Forensic Investigation","description":"Specialising in Forensic Investigation","publisher":{"@id":"https:\/\/www.hawkins.biz\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.hawkins.biz\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.hawkins.biz\/#organization","name":"Hawkins and Associates","url":"https:\/\/www.hawkins.biz\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/","url":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg","contentUrl":"https:\/\/www.hawkins.biz\/wp-content\/uploads\/2022\/03\/logo_svg.svg","width":164,"height":61,"caption":"Hawkins and Associates"},"image":{"@id":"https:\/\/www.hawkins.biz\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/hawkins-and-associates-limited\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study\/17220","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/types\/case_study"}],"version-history":[{"count":28,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study\/17220\/revisions"}],"predecessor-version":[{"id":41449,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/case_study\/17220\/revisions\/41449"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/media\/17221"}],"wp:attachment":[{"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/media?parent=17220"}],"wp:term":[{"taxonomy":"experties","embeddable":true,"href":"https:\/\/www.hawkins.biz\/wp-json\/wp\/v2\/experties?post=17220"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}